Tampilkan postingan dengan label My Office. Tampilkan semua postingan
Tampilkan postingan dengan label My Office. Tampilkan semua postingan

Minggu, Mei 08, 2011

Aja Gileeee Tanjung

Koleksi kawan-kawan di Tanjung, sukses buat kalian dan tetap semangat...berjuanglah dari nol dan jangan suka ngeluh :) hehehe. Mari kita sama-sama belajar. okay?

Semangat!

Dua sejoli lagi pandang-pandangan.

Biasa, preman pabrik, wkwk

Wong Eduaaan.

Oi, mana tongkat ane?mau cek boiler neh.

idih,, mas booy....



he did seriously
mas boy,wkwk

 Kalau mereka ketemu dijalan, dibata aja gan...aja gileeeee tanjung...haha
Chaiyo..

Sabtu, Mei 07, 2011

membaca sambil menulis : DASAR-DASAR KATALIS

Tengah malam mencoba membaca kembali dasar-dasar tentang katalis, terus agar dapat dipahami, saya tulis aja kesimpulan sederhana dalam blog ini. Sekedar sharing pengetahuan dasar tentang katalis. 

http://hexogenerz.files.wordpress.com/2010/08/katalis.jpg

Katalis merupakan bahan/zat yang dapat meningkatkan laju reaksi untuk mencapai kesetimbangan, dimana katalis terlibat di dalam reaksi secara tidak permanen. Kata kunci defenisi secara tidak permanen, karena katalis dan reaktan akan berinteraksi terlebih dahulu sebelum reaksi berlangsung. Produk interaksinya adalah suatu intermediet reaktif yang akan membentuk produk. Insteraksi substrat-katalis dapat terjadi secara homogen dimana reaktan dan katalis berada dalam fasa yang sama, biasanya cairan  atau interaksi dapat terjadi diantara interface kedua fasa. 

Katalis dapat dibedakan ke dalam dua golongan utama: katalis homogen dan katalis heterogen. Katalis heterogen adalah katalis yang ada dalam fase berbeda dengan pereaksi dalam reaksi yang dikatalisinya, sedangkan katalis homogen berada dalam fase yang sama. Satu contoh sederhana untuk katalisis heterogen yaitu bahwa katalis menyediakan suatu permukaan di mana pereaksi-pereaksi untuk sementara terjerap. Ikatan dalam substrat-substrat menjadi lemah sedemikian sehingga memadai terbentuknya produk baru. katan atara produk dan katalis lebih lemah, sehingga akhirnya terlepas.Katalis homogen umumnya bereaksi dengan satu atau lebih pereaksi untuk membentuk suatu perantara kimia yang selanjutnya bereaksi membentuk produk akhir reaksi, dalam suatu proses yang memulihkan katalisnya (wikipedia.org).

Reaksi terkatalis secara heterogen biasanya menggunakan katalis padat, dimana interaksinya terjadi pada interface gas/padat atau cair/padat. Masalah transfer fasa dapat terjadi jika reaktan berupa gas juga terdapat di dalam sistem cair/padat. 

Walaupun katalis dapat meningkatkan laju reaksi, katalis tidak dapat digunakan untuk mengawali suatu reaksi yang secara termodinamika tidak mungkin terjadi. Entalpi reaksi dan faktor-faktor termodinamika lainnya adalah fungsi natural reaktan dan produk saja, sehingga tidak dapat dimodifikasi oleh keberadaan katalis. Faktor kinetik seperti laju reaksi, energi aktivasi, keadaan dasar transisi dan lainnya, merupakan karakteristik reaktan yang dipengaruhi oleh katalis.


Sifat-sifat katalis :
1. Katalis tidak mengalami perubahan yang permanen dalam reaksi, tapi terlibat dalam mekanisme reaksi.
2. Katalis mempercepat laju reaksi tetapi tidak mengubah jenis maupun jumlah hasil reaksi.
3. Katalis dapat menurunkan energi aktivasi, tetapi tidak mengubah entalpi reaksi.
4. Katalis mengubah mekanisme reaksi dengan menyediakan tahap-tahap yang mempunyai energi pengaktifan lebih rendah.
5. Katalis mempunyai aksi spesifik, artinya hanya dapat mengkatalisis reaksi tertentu.
6. Katalis hanya diperlukan dalam jumlah sedikit.
7. Katalis dapat teracuni.

sumber : Kimia Katalis (Prof Wega), wikipedia dan sumber lain.
Katalis homogen dan heterogen?studi kasus?I am reading n thinking.....

Selasa, April 12, 2011

Bandung on vacation

Dalam rangka kerjaan, sedikit waktu terluang sambil menunggu travel mau ke jakarta. coba ceprat cepret dengan kamera bulukku, hehehe...
Sedikit foto-foto tentang kota Bandung :

 1. Penjual Senapan Angin @Cihampelas

2. Di satu sudut jalan

3. Satu sudut pasar mewah (mall)

4. ITB

5. Perempatan di Cihampelas
 

6. Ciwalk
 

Senin, April 11, 2011

Kerja kerja kerja

Bekerja, sebuah aktivitas yang memang kurang enak dibanding kuliah. Dulu kuliah tinggal belajar, minta duit ama keluarga, uang kuliah, walaupun kadang-kadang sangat kurang. Hingga akhirnya harus nyambi sana sini agar bisa bertahan di kota tercinta kedua itu. Bekerja, sepertinya dari dulu gak pernah keluar dari yang namanya butuh waktu ekstra. Coba di swasta, orang-orang dah pada ngorok, kita baru pulang. alhamdulillah ada teman2 yang selalu menemani dan fighting bareng....
Sekarang, bekerja juga membutuhkan waktu ekstra. trus kucoba merenung, kok gak habis-habis sih kerjaan?apa karena gajinya gak habis-habis ya?hehehe... trus apa karena aku gak sanggup mengelola pekerjaan?atau karena kerja selalu kepikiran, sehingga tersugesti untuk  merasa pekerjaan gak habis-habis akhrinya stress. auzubillah...
 Yang terpenting sebenarnya, nikmati pekerjaan, bekerjalah dengan tanggung jawab, tapi bekerjalah karena kerjaan harus diselesaikan, karena besok akan ada pekerjaan lagi.  Jangan bekerja karena atasan, karena atasanpun bisa berganti-ganti. Jika bekerja karena harus diselesaikan dengan tanggung jawab, dengan siapapun atasan, kerjaan akan bagus dan memuaskan. Bekerjalah semaksimal kemampuan kita....Berperanlahh sebisa kita, karena setiap manusia sudah diberikan kompetensi masing-masing oleh Tuhan.

Kerja kerja kerja

Selasa, Maret 31, 2009

|#1|BRDST BPPT PROFILE|

BRDST PROFILE

BALAI REKAYASA DISAIN DAN SISTEM TEKNOLOGI
(ENGINEERING CENTER – BPPT)
AGENCY FOR THE ASSESSMENT AND APPLICATION OF TECHNOLOGY


BACKGROUND
BALAI REKAYASA DISAIN DAN SISTEM TEKNOLOGI - BPPT, is a unit in Deputy Technology of Information, Energy and Material (TIEM) - BPPT or popularly known as ENGINEERING CENTER – BPPT which carries out tasks in assessment and development of Engineering Design Technology for process industry as well as power plant.

Established in January 1993 with a name as Tim Pusat Pengembangan Rekayasa dan Rancang Bangun BPIS (P2R2B – BPIS) or also known as Engineering Center – BPIS under cooperation of Biro Teknologi Rekayasa Rancang Bangun BPIS with Direktorat TKKE-TIEML-BPPT. In mid 1995 the group changed its name to Pusat Rekayasa Rancang Bangun–BPPT (PRRB) with an initial activity in engineering design of Nuclear Power Plant AP600 for Westinghouse Electric Corporation, USA in the scope of turbine building, which has been a continuous cooperation up to now.

Taking into account the development and improvement of Engineering Center BPPT’s capabilities in engineering design, the team’s facilities, since 4 April 2001 this team was therefore changed to become a technical unit called : Balai Rekayasa Disain dan Sistem Teknologi – BPPT.

VISION
Technology is used to accelerate the economic growth in the frame of social welfare.

MISSION
To make BPPT as a technology center of excellence,
To make BPPT as a society development agency in the field of technology,
To increase the role of technology audit and commercialization,
To increase the competitive ability and the industrial productivity.

OBJECTIVE
To do the government task in the field of the assessment and application of technology according to the valid government regulation.

ENGINEERING SERVICES
The group provides a wide range of engineering services from conceptual design through to fabrication, construction, operation, maintenance and decommissioning, including :

Process System Design, Mechanical Equipment Design, Steel Structure Design, Piping Layout, Piping Stress Analysis, Electrical System Design, Instrumentation And Control System Design, System Modularization, Plant Data & Project Management, 2D/3D Computer Aided Design/Graphics Modeling, Technical Training In Piping and Plant Design, Engineering-Procurement-Construction of Biodiesel Plant.

Engineering Center-BPPT is supported with sophisticated software packages to enable the engineers to integrate all design tasks efficiently from preliminary design task up to generating the final engineering drawings for fabrication and construction. An up to date data management system permits valuable design data to be managed systematically hence ensuring design data accuracy during the project life.

SOFTWARE FACILITIES UTILITY
• Intergraph PDS, a sophisticated Plant Design software package : PFD, P&ID, Wire Work, CRD, CB/CLD, EQP, Piping, Drawing & Isometric Manager, Instrumentation Data Management, etc.
• XSteel, Frame Work Plus for steel structure 3D model design and steel detailing
• Gate Cycle for process design, thermodynamics, heat and mass balance calculation
• Advanced Pressure Vessel (APV)
• PS+CAE Pipe and CAESAR-II for piping stress analysis calculation
• STAAD Pro, for steel and concrete structure stress analysis
• Microstation and Autocad, both are for 2D drafting and 3D modeling
• Microsoft Office utility software: Word, Excel, PP, Access, Project, etc.
• Solaris, Sun Micro-system Server/ Client Operating System
• Clix Intergraph Server/ Client Operating System
• Oracle, Oracle Database Server (RDBMS).

HUMAN RESOURCES / ENGINEER
• Process – 5
• Mechanical – 7
• Electrical – 3
• Instrumentation & Control – 2
• Civil – 2
• Informatics – 2
• Chemical Analyst – 2
• Drafter – 5
• Support Engineer – 10
• Drafter – 5
• Administrator – 5

PROJECT EXPERIENCE
The Group involved in various projects with local as well as overseas clients such as:
• Westinghouse AP600 and AP1000 Nuclear Passive Reactor, Westinghouse Electric Corporation, Pittsburgh, PA. USA
• Madura “BD” Development Project, PT PAL Indonesia
• Bontang LNG Plant Expansion Project -Train H, PT. IKPT ( Inti Karya Persada Teknik )
• Plant Design Training, PT. Rekayasa Industri
• Hg and CO2 Removal in Natural Gas Processes, Piping and Plant Design Training, PT. Pakarya Industri
• TUNU Development Project, PT PALAMEC
• VITA-A Retrofit – Well Platform, PT PALAMEC
• Module Structure Design for AFT Transom Platform for Additional Cable Release System at Widuri Tanker, PT PALAMEC
• Tangguh LNG Plant FEED participation, Bechtel Corp. Houston, USA
• PIM-2 Ammonia and Urea Structure Detailing, PT Rekayasa Industri
• PIM-2 Ammonia and Urea Plant Modeling, PT. Krakatau Engineering Corp.
• Detail design for Mini CPO Plant
• EPC of Biodiesel Plant with capacities of 1 – 3 and 6 – 10 tons/day

Apart from the clients mentioned above, the Engineering Center-BPPT has also interfaced with subcontractors such as Bechtel Corp., Southern Electric Co., Burns & Roe, Ansaldo, Initec and SNERDY (Shanghai Nuclear Engineering Research and Development Institute). And the Group has been acknowledged of being satisfactorily performed the work awarded by Westinghouse Electric Corp.

Fast, reliable and best quality services are our commitment to customers.

Balai Rekayasa Disain dan Sistem Teknologi (BRDST)
(Engineering Center) - BPPT Building 1/ 6th Floor
Jl. MH. Thamrin 8 Jakarta 10340 Indonesia
Telp : 62-21-3915536, 3168240 Fax : 62-21-3915535

BRDST – BPPT, Building 480
Kawasan PUSPIPTEK Serpong, Tangerang
Telp : 62-21-7563217, 68377441 Fax : 62-21-7563273

disadur dari : www.agungwijono.blogspot.com

Senin, Maret 30, 2009

My Job Partner

Foto ini diambil pada saat acara peresmian gedung baru BRDST, inilah tim yang selalu bekerja bersama untuk menghasilkan output yang lebih baik.

My Partner


Foto bersama crew EC-BRDST Badan Bengkajian dan Penerapan Teknologi